Bockstael Construction is named on 9 tracked Manitoba projects and 8 Manitoba filings, as general contractor. 9 projects are live, with 424 units in the pipeline. The record named it 8 times in the last 12 months, most recently in Sep 2026. It shares the most projects with SMS Engineering, Cibinel Architecture Ltd., Eritrean Community in Winnipeg Inc..
The file has every filing and project where the record names them.
Every bar is a month of public filings that name Bockstael Construction, from Nov 2025. A filing counts once, whatever role it names them in.
No contact details on file.
| Project | Their role | Status | Type | Units | Sq Ft | Expected |
|---|---|---|---|---|---|---|
| 2340 Pembina Hwy 2340 Pembina Hwy, Winnipeg, MB | general contractor | Approved | Other | · | · | · |
| 252 Good St 252 Good St, Winnipeg, MB | general contractor | Approved | Other | 165 | · | · |
| 490 Shaftesbury Blvd 490 Shaftesbury Blvd, Winnipeg, MB | general contractor | Approved | Other | 59 | · | · |
| 507 Elgin Ave 507 Elgin Ave, Winnipeg, MB | general contractor | Approved | Other | 55 | · | · |
| 510 Selkirk Ave 510 Selkirk Ave, Winnipeg, MB | general contractor | Approved | Other | 8 | · | · |
| 637 Main St 637 Main St, Winnipeg, MB | general contractor | Approved | Other | 116 | · | · |
| 675 Mcdermot Ave 675 McDermot Ave, Winnipeg, MB | general contractor | Approved | Other | · | · | · |
| 70 Snow St 70 Snow St, Winnipeg, MB | general contractor | Approved | Other | · | · | · |
| 927 Notre Dame Ave 927 Notre Dame Ave, Winnipeg, MB | general contractor | Approved | Other | 21 | · | · |
How this file is built: every count comes from public filings (permits) and the project files Groundbreak tracks in Manitoba. A filing counts once, however many times it names Bockstael Construction. Partners are firms named on the same projects or filings.