English Street NW, Atlanta, GA (Blandtown)InfrastructureTracked since Oct 14, 2026
Groundbreak Pro · Project file
Who's behind Atlanta Beltline 22-Mile Mainline Trail Loop (Final Blandtown Parcel)?
Filings on this project land here the day they post, with the contractor, the owner and the lender named.
- 🔒 7 tracked changes

Specifications
- Status
- Under Construction
- Expected Completion
- Dec 31, 2030
- Neighborhood
- Blandtown / Citywide
- Lot Size
- 0.2 ac
- Data as of
- Oct 14, 2026
22-mile multi-use trail looppedestrian bridge over Northside Driveconnection to 45+ neighborhoodsparks and trails
Groundbreak Pro
- 🔒 7 tracked changes