SUN, NOV 22Filings 7d118Permits 7d102Deeds & loans 7d2Starts 7d0Updates 7d32Building389Contacts23,814
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour.