WED, NOV 4Filings 7d407Permits 7d146Deeds & loans 7d4Starts 7d0Updates 7d408Building370Contacts21,793
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually right before the first pour.