Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: A & N Electric Inc, under BLDGC25-0439 · Electrical renovation of the existing suite per plans & specifications · 1 permit
Jan 26, 2026
Plumbing
Plumbing permit: Dan's Plumbing Service, under BLDGC26-0041 · Plumbing of bathroom · 1 permit
Mar 3, 2026
Electrical
Electrical permit: Fawaz electric INC, under BLDGC26-0041 · Some rewiring to make sure everything is code compliant and rough in for small bathroom · 1 permit
Mar 11, 2026
Plumbing
Plumbing permit: MJR Mechanical Inc., under BLDGC26-0167 · Re-install existing water closet and wall hung lavs, after new tile and dry wall. Also cap off two showers that are no longer needed. · 1 permit
May 13, 2026
Electrical
Electrical permit: IB Electric Inc, under BLDGC26-0193 · #2 plugs + #2 switches · 1 permit
Jun 2, 2026
HVAC
Mechanical permit: Altech Mechanical Service, under BLDGC26-0396 · Remove and replace RTU - One for one RTU · 1 permit
Oct 16, 2026
Electrical
Electrical permit: Hopp Electric, under BLDGC26-0396 · DISCONNECT/RECONNECT RTU'S TO BE REPLACED. INSTALL NEW DISCONNECTS IF NECESSARY. · 1 permit