SUN, NOV 22Filings 7d118Permits 7d102Deeds & loans 7d2Starts 7d0Updates 7d32Building389Contacts23,814
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.