FRI, NOV 6Filings 7d384Permits 7d135Deeds & loans 7d3Starts 7d0Updates 7d408Building376Contacts22,460
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour.