- Status
- Proposed
- Use
- Mixed Use
- Units
- 300
- Floors
- 30
- Square Footage
- 612,000
- Construction Start
- Dec 30, 2027
- Expected Completion
- Dec 30, 2030
- Lot Size
- 2.2 ac
- Data as of
- Sep 30, 2026
Dallas' highest rooftop swimming poolconference centerlounge6,000-square-foot outdoor terracepedestrian plaza with heirloom treeretail and diningdirect access to Trinity Strand Trail and The Loop Connector