The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Plumbing
Plumbing permit: PFL MECHANICAL CORP, under M01408559 · Plumbing changes on the 5th floor as indicated on drawings. · 1 permit
Aug 3, 2026
Fire protection & life safety
Fire protection permit: GRUSHINSKY PIPNG & HTG IN, under M01408559 · Sprinkler changes on the 5th floor as indicated on drawings. · 1 permit
Aug 3, 2026
Electrical
Electrical permit: ULTRA ELECTRIC CORP, under M01408559 · All work in suite 507 on the 5th floor ONLY. Electrical alteration for power and lighting. · 1 permit
Aug 14, 2026
Electrical
Electrical permit: RX ELECTRIC INC, under M01408559 · TEMPORARY LIGHTING AND POWER 6TH FLOOR · 2 permits
Aug 21, 2026
Fire protection & life safety
Fire protection permit: MIDNIGHT EXPRESS MECH CRP, under M01408559 · American Gem (Suite 601) - Sprinkler work on the 6th floor as indicated on drawings. · 1 permit
Aug 25, 2026
Plumbing
Plumbing permit: BEDROCK PLUMBING & HEATING INC, under M01408559 · American Gem (Suite 601) - Plumbing work on the 6th floor as indicated on drawings. · 1 permit
Aug 26, 2026
HVAC
Mechanical permit: TRI-STAR CONSTRUCTION COR, under M01408559 · American Gem (Suite 601) - Mechanical work on the 6th floor as indicated on drawings. · 1 permit