The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: R & T ELECTRICAL CORP, under Q01100094 · NB Service and general wiring. · 2 permits
Jan 15, 2026 to May 9, 2026
Plumbing
Plumbing permit: NYC MAINMAN CORP, under Q01100094 · INSTALL HOUSE CONNECTION FOR DEP: SD1&2 USE ONLY. THE DRYWELL FILED UNDER JOB#Q01100094-S3 · 1 permit
Apr 24, 2026
Plumbing
Plumbing permit: WASOFF PLBG & UTILITY CO, under Q01100094 · FILE PL & SP WORKTYPE IN CONJUNCTION WITH JOB#Q01100094 · 1 permit
Apr 27, 2026
Electrical
Electrical permit: SUNRUN SOLAR ELECTL CORP, under Q01100094 · COMBINED SYSTEM SIZE: 10.34W DC, 6.6W AC // MODULES: (23) ELIN ENERGY (SIRIUS PV):ELNSM54M-HC-N-450 // INVERTERS: (2) SOLAREDGE TECHNOLOGIES:SE3800H-USMN · 1 permit
Oct 29, 2026
Solar
Solar permit: SUNRUN INSTALLATION SVC, under Q01100094 · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. · 2 permits