The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, excavation: Site / Utility Permit for CP-2025-005454 · 1 permit
May 6, 2026
Plumbing
Plumbing permit: PLUMETRIX INC, under CP-2025-005454 · Plumbing fixtures containing :: • (19) full bathrooms (water closet, lavatory, tub/shower) across the 9 units • (9) kitchen sinks (1 per unit) • (9) laundry / washer box connections (1 per unit) • (9) water heater locations (1 per unit) · 2 permits
Mar 26, 2026 to Oct 20, 2026
Fire protection & life safety
Fire suppression permit: Aqueduct Fire Protection Systems, LLC, under CP-2025-005454 · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A BACKFLOW PREVENTION ASSEMBLY, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. · 2 permits
Mar 26, 2026 to Oct 8, 2026
Plumbing
Plumbing permit: THOMAS UHL, under CP-2025-005454 · Exterior Storm and Sanitary Plumbing for New Construction in accordance with EZ Permit Standard for Plumbing Exterior 1.5" Water Distribution for New Construction in accordance with EZ Permit Standard for Plumbing · 2 permits