The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
HVAC
Mechanical permit: H&W MECHANICAL SERVICES LLC, under CP-2025-005273 · Furnish and install twenty-nine (29) new split systems to replace existing along with some associated GRDs. · 1 permit
Mar 25, 2026
Electrical
Electrical permit: SUNLIGHT ELECTRICAL CONTRACTING CO., INC, under CP-2025-005273 · Electrical Permit for combo CP-2025-005273 · 1 permit
Jul 6, 2026
Other trade
Multifamily alteration: FOR LEVEL II ALTERATIONS (WITH NO CHANGE IN OCCUPANCY) PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHAICAL, ELECTRICAL AND PLUMBING WORK. · 1 permit
Nov 24, 2025
Other trade
Multifamily alteration: FOR LEVEL II ALTERATIONS (WITH NO CHANGE IN OCCUPANCY) PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHAICAL, ELECTRICAL AND PLUMBING WORK. · 1 permit
Nov 24, 2025
Other trade
Multifamily alteration: FOR LEVEL II ALTERATIONS (WITH NO CHANGE IN OCCUPANCY) PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHAICAL, ELECTRICAL AND PLUMBING WORK. · 1 permit
Nov 24, 2025
Other trade
Multifamily alteration: FOR LEVEL II ALTERATIONS (WITH NO CHANGE IN OCCUPANCY) PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHAICAL, ELECTRICAL AND PLUMBING WORK. · 1 permit