Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
HVAC
Mechanical permit: AIR MASTERS HVAC INC, under CP-2025-005631 · FOR ALTERATIONS TO AN EXISTING HVAC SYSTEM TO INCLUDE THE INSTALLATION OF NEW GRDs AND ASSOCIATED DUCTWORK CONNECTED TO EXISTING HVAC APPLIANCES. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-005631 FOR ASSOCIATED BUILDING PERMIT. · 2 permits
Dec 12, 2025 to Jul 20, 2026
Fire protection & life safety
Fire suppression permit: MK FIRE PROTECTION & SUPPLY, LLC, under CP-2025-005631 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 39 SPRINKLER HEADS THROUGHOUT PERMITTED SPACE · 2 permits
Dec 12, 2025 to Jun 8, 2026
Electrical
Electrical permit: City Lights electric llc, under CP-2025-005631 · Tenant fit out Rough and trim out the dedicated circuit and general receptacles as per plan Rough and trim out all geral lighting and decorative lighting as per plan Rough and trim out all exit sign /emergency lighting as per plan Existing service to be used All work to be done as per NEC 2017 No fire alarm included on this proposal · 3 permits
Dec 12, 2025 to Jun 11, 2026
Electrical
Electrical permit: B.H. HOLDINGS CORP ( Emergency Response Associates), under CP-2025-005631 · INSTALLING FOUR STROBES AND MANUAL PULL STATION FOR GYM FITOUT AS PER 2016 NFPA 72. TIED TO EXISTING SYSTEM. · 3 permits
Dec 12, 2025 to Jun 23, 2026
Plumbing
Plumbing permit: Plumbing Resolution Inc, under CP-2025-005631 · AMENDMENT 7/27/2026 REMOVAL OF FLOOR DRAINS FROM CONSTRUCTION SCOPE FIT/OUT FOR COMMERCIAL SPACE ON FIRST FLOOR OF MIXED USE BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 · 2 permits