The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
HVAC
Mechanical permit: LOR-MAR MECHANICAL SERVICES LLC, under CP-2026-003953 · **2021 IMC REVIEW** FOR THE INSTALLATION OF REGISTERS AND DIFFUSERS WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO APPLIANCES ON THIS PERMIT. · 2 permits
Nov 19, 2025 to Sep 3, 2026
Electrical
Electrical permit: THE MNM GROUP INC, under CP-2026-003953 · Low Voltage Telecommunication Cat6A cabling on 2 floors · 2 permits
Jul 20, 2026 to Sep 22, 2026
Fire protection & life safety
Fire suppression permit: A & S SPRINKLER CO INC, under CP-2026-003953 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (18) SPRINKLER HEADS, PER NFPA 13 · 1 permit
Jul 23, 2026
Electrical
Electrical permit: HATZEL & BUEHLER INC, under CP-2026-003953 · Furnish & Install Power and Lighting Relocations Per Plans and 2017 NEC. · 1 permit
Aug 14, 2026
Other trade
Commercial alteration: LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING FIFTH & SIXTH FLOOR OFFICE SPACES IN AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK** · 1 permit
Jul 20, 2026
Other trade
Commercial alteration: LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING FIFTH & SIXTH FLOOR OFFICE SPACES IN AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK** · 1 permit
Jul 20, 2026
Other trade
Commercial alteration: LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING FIFTH & SIXTH FLOOR OFFICE SPACES IN AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK** · 1 permit