The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Other trade
Commercial addition: LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) TO INCLUDE PARTIAL REAR DEMOLITION AND ERECTION OF REAR ADDITION WITH ROOF DECK (FOR EXISTING RESIDENTIAL UNIT ABOVE) FOR AN EXISTING SIT-DOWN RESTAURANT ON THE FIRST FLOOR OF AN EXISTING BUILDING AS PER APPROVED PLANS. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2021 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP WORK** · 1 permit