The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: City Lights electric llc, under RP-2025-011342 · Electrical Permit for combo RP-2025-011342 · 2 permits
May 28, 2026 to Aug 26, 2026
Other trade
Residential new construction: FOR THE ERECTION OF A NEW TWO (2) STORY ATTACHED STRUCTURE. TO BE USED AS A SINGLE-FAMILY DWELLING AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK. · 1 permit