The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: FIRST ELECTRIC LIGHTING AND DESIGN, under CP-2026-002286 · Demo - Disconnect lights and outlets - Provide temp power and lighting for project duration (if needed) - Disconnect and Remove Low Volt 9if needed) Power and Lighting - Supply and Install new outlets per plan (existing to remain if applicable) - (7) Duplex Outlets - (3) Window outlets (ceiling) - (1) GFI Outlet - (2) Junction Boxes - Supply and Install timer and sign circuit per plan - Re-device existing outlets and s · 2 permits
Jul 14, 2026 to Oct 26, 2026
Fire protection & life safety
Fire suppression permit: Oliver Sprinkler Co., Inc, under CP-2026-002286 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (13) sprinklers to accommodate interior alterations · 2 permits
Jul 14, 2026 to Jul 23, 2026
HVAC
Mechanical permit: MADSEN INC, under CP-2026-002286 · Mechanical / Fuel Gas Permit for combo CP-2026-002286 · 2 permits