The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: AURELIO XHEPAJ, under CP-2025-006028 · Installation of Two new panels. Interior wiring installation of Lighting and receptacles per approved plans NEC 2017 Installation of smoke detectors, Horn and strobes Existing FACP to remain Per approved plans · 2 permits
Dec 9, 2025 to Mar 4, 2026
Fire protection & life safety
Fire suppression permit: A & S SPRINKLER CO INC, under CP-2025-006028 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS IN SUITE 801, PER NFPA 13 · 2 permits