Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Fire protection & life safety
Fire suppression permit: A & S SPRINKLER CO INC, under CP-2026-002370 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (4) sprinkler heads, per NFPA 13 · 2 permits
Feb 24, 2026 to May 28, 2026
HVAC
Mechanical permit: HUNTER MECHANICAL INC, under CP-2026-002370 · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Furnish labor to relocate 4 existing diffusers in suite 1210, with no wall penetrations and within a single tenant space, per signed EZ Standard · 2 permits
Feb 25, 2026 to May 28, 2026
Electrical
Electrical permit: HATZEL & BUEHLER INC, under CP-2026-002370 · Addition & Alteration to the existing FA system . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. · 3 permits
Mar 5, 2026 to Jun 26, 2026
Other trade
Commercial alteration: FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARTE PERMITS REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK. *2018 IEBC* · 2 permits
Feb 11, 2026 to May 26, 2026
Other trade
Commercial tenant fit-out: FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE ON THE 12TH FLOOR LEVEL OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.** · 1 permit
Feb 11, 2026
Other trade
Commercial alteration: FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARTE PERMITS REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK. *2018 IEBC* · 2 permits
Feb 11, 2026 to May 26, 2026
Other trade
Commercial alteration: FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARTE PERMITS REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK. *2018 IEBC* · 2 permits