The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, excavation: FOR EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION AS PER APPROVED PLANS. WORK TO INCLUDE TEMPORARY EXCAVATION SUPPORT SYSTEM. NO BUILDING CONSTRUCTION APPROVED ON THIS PERMIT. SEE ZP-2022-002981 FOR ZONING APPROVAL OF DEVELOPMENT. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR BUILDING CONSTRUCTION** **ISSUANCE OF THIS EXCAVATION PERMIT SHALL NOT BE CONSTRUED TO ESTABLISH ASSURANCE THAT A PERMIT FOR THE ERECTION OF THE ENTIRE STRUCTURE WIL BE GRANTED.** · 1 permit