Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Fire protection & life safety
Fire suppression permit: DC MECHANICAL II LLC, under CP-2025-005223 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 18 sprinkler heads · 2 permits
Apr 27, 2026 to Jun 30, 2026
Electrical
Electrical permit: CARLOS A NUNEZ, under CP-2025-005223 · Main Electrical Panel: Install 1 main panel in the basement, distributing power to sub-panels on each floor. Wiring: Run copper wiring from the main panel to sub-panels and outlets. Install dedicated circuits for HVAC units and appliances. Lighting: Install recessed lights, pendant fixtures, and wall-mounted lights as per the lighting schedule. Provide switches for each fixture. Outlets: Install general outlets and dedicated appliance out · 2 permits
Apr 27, 2026 to Sep 29, 2026
HVAC
Mechanical permit: BLUE PRINT MECHANICAL LLC, under CP-2025-005223 · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · 2 permits
Apr 27, 2026 to Jun 16, 2026
Plumbing
Plumbing permit: BLUE PRINT MECHANICAL LLC, under CP-2025-005223 · ALTERATIONS TO FLOORS 2-6 TO CREATE DWELLINGS. ALL WORK BELOW SECOND FLOOR IN COMMERCIAL SPACE IS EXISITNG TO REMAIN. PIPING LOCATED IN COMMERCIAL SPACE SHALL BE METALLIC. ENTING SERVING COMMERICLA SPACE IF INSTALLED I REQUIRED TO BE METALLIC TO ROOF EXTENTION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND · 1 permit