Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: CHARLES H MACDONALD ELECTRIC I, under CP-2026-005284 · Install lighting fixtures, light switches, wiring devices, and TV receptacles. All work to be perform according to the 2020 NEC and per approved plans. · 4 permits
Feb 20, 2026 to Oct 15, 2026
Electrical
Electrical permit: DANIEL GRAMLICH, under CP-2026-005206 · Electrical Permit for combo CP-2026-005206 · 4 permits
Jul 16, 2026 to Sep 17, 2026
HVAC
Mechanical permit: COLLEEN HARTER, under CP-2026-005206 · Mechanical / Fuel Gas Permit for combo CP-2026-005206 · 4 permits
Jul 16, 2026 to Sep 17, 2026
HVAC
Mechanical permit: OREILLY EDWARD B & ASSOC INC, under CP-2026-005284 · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 1 register/diffuser. · 2 permits
Sep 8, 2026 to Oct 20, 2026
Fire protection & life safety
Fire suppression permit: A & S SPRINKLER CO INC, under CP-2026-005284 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (2) SPRINKLER HEADS IN UNIT 2502 · 2 permits