The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work permit: R&D Realty LLC, under RP-2025-010362 · Site / Utility Permit for RP-2025-010362 · 1 permit
Nov 17, 2025
Fire protection & life safety
Fire suppression permit: Michael J Mccullough jr, under RP-2025-010362 · FOR THE INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT THREE STORY BUILDING TO INCLUDE 1-INCH COMBINED WATER SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · 2 permits
Nov 6, 2025 to Mar 28, 2026
Plumbing
Plumbing permit: THOMAS UHL, under RP-2025-010362 · Plumbing Permit (Water Distribution) for combo RP-2025-010362 · 4 permits
Nov 6, 2025 to Dec 16, 2025
Other trade
Residential new construction: NEW CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE PILOT HOUSE AND ROOF DECK FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA-13D Minimum) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. Amend Permit 7/20/26 to document th · 1 permit
Nov 6, 2025
Other trade
Residential new construction: NEW CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE PILOT HOUSE AND ROOF DECK FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA-13D Minimum) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. Amend Permit 7/20/26 to document th · 1 permit
Nov 6, 2025
Other trade
Residential new construction: NEW CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE PILOT HOUSE AND ROOF DECK FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA-13D Minimum) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. Amend Permit 7/20/26 to document th · 1 permit
Nov 6, 2025
Other trade
Residential new construction: NEW CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE PILOT HOUSE AND ROOF DECK FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA-13D Minimum) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY. Amend Permit 7/20/26 to document th · 1 permit