The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Fire protection & life safety
Fire suppression permit: Oliver Sprinkler Co., Inc, under CP-2025-001895 · INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 WITH A FIRE DEPARTMENT CONNECTION, BACKKFLOW PREVENTION DEVICE AND 4" SERVICE LINE, THROUGHOUT A TWO (2) STORY STRUCTURE. SEPARATE PERMIT REQUIRE FOR ALL PLUMBING WORK · 2 permits
Nov 21, 2025 to Aug 17, 2026
HVAC
Mechanical permit: OREILLY EDWARD B & ASSOC INC, under CP-2025-001895 · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. · 2 permits