Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Demolition
Demolition: MAKE SAFE PERMIT FOR THE COMPLETE DEMOLITION OF THE SEMI-DETACHED TWO-STORY STRUCTURE BY HAND AND HAND HOLD DEVICES. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *SEPERATE STREETS DEPARTMENT PERMIT REQUIRE FOR CLOSURE OF RIGHT OF WAY. *21 DAY POSING AND NOTICE WAIVED PER A-303.2 *A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN MIN. 7 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC. · 1 permit