The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
HVAC
Mechanical permit: RADOSLAW ZBIKOWSKI, under RP-2025-012623 · Mechanical / Fuel Gas Permit for combo RP-2025-012623 · 2 permits
Jan 8, 2026 to Feb 26, 2026
Electrical
Electrical permit: ALLEN SPEARMAN, under RP-2025-012623 · Electrical Permit for combo RP-2025-012623 · 2 permits
Jan 8, 2026 to Jan 9, 2026
Fire protection & life safety
Fire suppression permit: ONEIDA FIRE PROTECTION INC, under RP-2025-012623 · FOR THE INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT THREE STORY BUILDING TO INCLUDE 1-INCH COMBINED WATER SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · 2 permits
Jan 8, 2026 to Mar 16, 2026
Plumbing
Plumbing permit: PROSTAR PLUMBING LLC, under RP-2025-012623 · Plumbing Permit (Interior) for combo RP-2025-012623 · 4 permits