The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, excavation: Site / Utility Permit for CP-2026-001776 · 1 permit
May 22, 2026
Other trade
Commercial new construction: FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE CELLAR AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS COMMERCIAL SPACE AT CELLAR AND GROUND FLOOR SPACE WITH SINGLE-FAMILY HOUSEHOLD LIVING ABOVE. AS PER APPROVED PLANS. ****************************SEPARATE PERMITS FOR ANY OTHER WORK. ***************************************** · 1 permit
May 20, 2026
Other trade
Commercial new construction: FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE CELLAR AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS COMMERCIAL SPACE AT CELLAR AND GROUND FLOOR SPACE WITH SINGLE-FAMILY HOUSEHOLD LIVING ABOVE. AS PER APPROVED PLANS. ****************************SEPARATE PERMITS FOR ANY OTHER WORK. ***************************************** · 1 permit