The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Fire protection & life safety
Fire suppression permit: Michael J Mccullough jr, under CP-2025-005265 · FOR INSTALLATION OF A TWO-INCH FIRE SERVICE LINE, TWO-INCH BACKFLOW PREVENTER AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13R. · 2 permits
Feb 6, 2026 to Mar 9, 2026
Electrical
Electrical permit: DRIJON GJONI, under CP-2025-005265 · INSTALL ALL WIRING FOR BUILDING. OUTLETS ,SWITCHES,LIGHTING,SMOKE ALARMS ,FIRE ALARM. INSTALL 300 AMP SERVICE WITH 4 POSITION METER SOCKET. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. · 2 permits
Feb 6, 2026 to Mar 16, 2026
HVAC
Mechanical permit: ANGEL HEATING & COOLING INC, under CP-2025-005265 · INSTALLATION OF AN HVAC SYSTEM FOR A NEW CONSTRUCTION 3 -FAMILY DWELLING AS PER APPROVED PLANS. *2018 IMC REVIEW* · 2 permits
Feb 6, 2026 to Jun 2, 2026
Plumbing
Plumbing permit: THOMAS UHL, under CP-2025-005265 · Full interior plumbing rough-in for new construction 3 family building · 2 permits
Feb 6, 2026 to Apr 29, 2026
Plumbing
Plumbing permit: Justin's Plumbing and Heating LLC, under CP-2025-005265 · REPAIR/REPLACE SANITARY & STORM CTs, FAIs, MDs & 1.5" WATER LINE. · 2 permits
Feb 6, 2026 to Apr 20, 2026
Other trade
Multifamily new construction: FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE. FOR USE AS THREE (3) DWELLING UNITS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK. AMENDMENT APPROVED AS OF 09/16/2026: TO REMOVE UNDERPINNING FROM THE ORIGINAL APPROVAL. · 1 permit
Feb 6, 2026
Other trade
Multifamily new construction: FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE. FOR USE AS THREE (3) DWELLING UNITS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK. AMENDMENT APPROVED AS OF 09/16/2026: TO REMOVE UNDERPINNING FROM THE ORIGINAL APPROVAL. · 1 permit
Feb 6, 2026
Other trade
Multifamily new construction: FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE. FOR USE AS THREE (3) DWELLING UNITS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK. AMENDMENT APPROVED AS OF 09/16/2026: TO REMOVE UNDERPINNING FROM THE ORIGINAL APPROVAL. · 1 permit