The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
HVAC
Mechanical permit: EAST COAST BUSINESS FIRE INC, under CP-2026-005153 · **2021 IMC REVIEW** FOR THE INSTALLATION OF ONE (1) 6'-0" HOOD ACCESSORY TO AN EXISTING GROCERY STORE WITH EXHAUST FAN AND A MAKE UP AIR FAN WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** SEPARATE FIRE SUPPRESSION PERMIT REQUIRED FOR FIRE EXTINGUISHING SYSTEM** · 2 permits