The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work permit: R&D Realty LLC, under RP-2025-010305 · Site / Utility Permit for RP-2025-010305 · 1 permit
Jan 21, 2026
HVAC
Mechanical permit: Oris-Hvac Inc, under RP-2025-010305 · Mechanical / Fuel Gas Permit for combo RP-2025-010305 · 2 permits
Dec 10, 2025 to Apr 6, 2026
Fire protection & life safety
Fire suppression permit: Michael J Mccullough jr, under RP-2025-010305 · FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13D THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 1" COMBINED FIRE SERVICE LINE AS PER APPROVED PLANS. **ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.** · 2 permits
Dec 10, 2025 to Jun 6, 2026
Plumbing
Plumbing permit: THOMAS UHL, under RP-2025-010305 · Plumbing Permit (Interior) for combo RP-2025-010305 · 4 permits
Dec 10, 2025 to Apr 6, 2026
Other trade
Residential new construction: FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK ACCESS STRUCTURE. FOR USE AS A TWO-FAMILY HOUSEHOLD LIVING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA13R. **SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY CODE COMPLIANC · 1 permit
Dec 10, 2025
Other trade
Residential new construction: FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK ACCESS STRUCTURE. FOR USE AS A TWO-FAMILY HOUSEHOLD LIVING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA13R. **SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY CODE COMPLIANC · 1 permit
Dec 10, 2025
Other trade
Residential new construction: FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK ACCESS STRUCTURE. FOR USE AS A TWO-FAMILY HOUSEHOLD LIVING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA13R. **SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY CODE COMPLIANC · 1 permit
Dec 10, 2025
Other trade
Residential new construction: FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK ACCESS STRUCTURE. FOR USE AS A TWO-FAMILY HOUSEHOLD LIVING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA13R. **SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY CODE COMPLIANC · 1 permit