The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Plumbing
Plumbing permit: DARRYLS PLUMBING & HEATING INC, under CP-2026-004407 · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing. · 2 permits
Sep 4, 2026 to Sep 21, 2026
Electrical
Electrical permit: MARK REDGUARD, under CP-2026-004407 · Organize existing wiring to the first floor commercial space only. Remove existing Romex wiring. Install six new baseboard heaters. Replace existing 200 amp panel with new panel. Install wiring and devices for the new bathroom. Install new lighting fixtures to the store front sales area. All work to be perform according to the 2020 NEC and per executed contract. · 2 permits