The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Fire protection & life safety
Fire suppression permit: Sal calio, under CP-2026-001365 · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE AN EXISTING 3" MAIN FIRE SERVICE LINE WITH 4-INCH WILKINS 350A BACKFLOW PREVENTER AND AUTOMATIC FIRE SUPPRESSION SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · 1 permit