The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
HVAC
Mechanical permit: PMC Mechanical Enterprise, LLC, under CP-2026-001887 · FOR THE INSTALLATION OF AN APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · 2 permits
Jun 15, 2026 to Jul 6, 2026
Electrical
Electrical permit: CHARLES H MACDONALD ELECTRIC I, under CP-2026-001887 · Electrical alterations on 1st, 2nd, and 4th floors. Fire alarm device installed in the 4th-floor bathroom; all work per approved plans · 2 permits