The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
HVAC
Mechanical permit: Bedri Allaraj, under CP-2025-005800 · FOR A MECHANICAL SYSTEM ALTERATION TO ACCOMMODATE AN EXISTING STRUCTURE CHANGED TO A MULTI-FAMILY HOUSEHOLD LIVING. EQUIPMENT TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **IMC 2018** · 2 permits
Mar 18, 2026 to Sep 15, 2026
Plumbing
Plumbing permit: ZURAB ODIKADZE, under CP-2025-005800 · ALTERATIONS TO TRIPLEX. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS · 2 permits
Mar 18, 2026 to Apr 19, 2026
Fire protection & life safety
Fire suppression permit: ONEIDA FIRE PROTECTION INC, under CP-2025-005800 · FOR THE INSTALLATION OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A THREE (3) FAMILY DWELLING TO INCLUDE A TWO (2) INCH FIRE SERVICE LINE AND A TWO (2) INCH BACKFLOW PREVENTER. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13 BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. SEE CP-2025-005800 FOR ASSOCIATED BUILDING PERMIT. · 2 permits