Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Plumbing
Plumbing permit: Justin's Plumbing and Heating LLC, under CP-2026-000211 · INSTALL SANITARY AND STORM CTs, FAIs, MDs & 1" WDP. · 2 permits
Feb 11, 2026 to Apr 28, 2026
Plumbing
Plumbing permit: PLUMETRIX INC, under CP-2026-000211 · ALTERATIONS TO CREATE A QUADPLEX. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS · 2 permits
Feb 11, 2026 to Sep 17, 2026
Fire protection & life safety
Fire suppression permit: Michael J Mccullough jr, under CP-2026-000211 · FOR THE INSTALLATION OF A 2-INCH FIRE SERVICE LINE FOR AN AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM WITH A 2 INCH WILKINS 950XLT2 BACKFLOW PREVENTION ASSEMBLY IN ACCORDANCE WITH NFPA 13R. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/ HYDRAULIC CALCULATIONS. · 2 permits
Feb 11, 2026 to Apr 21, 2026
HVAC
Mechanical permit: YMK CONSTRUCTION LLC, under CP-2026-000211 · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. · 2 permits