Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Plumbing
Commercial tenant fit-out: FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A CHILDCARE CENTER (GROUP E), ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **PERMIT INCLUDES WORK TO BE LEGALIZED (INCLUDING MEP WORK) AS ACKNOWLEDGED IN · 2 permits
Sep 25, 2026 to Oct 15, 2026
HVAC
Commercial tenant fit-out: FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A CHILDCARE CENTER (GROUP E), ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **PERMIT INCLUDES WORK TO BE LEGALIZED (INCLUDING MEP WORK) AS ACKNOWLEDGED IN · 2 permits