The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, excavation: FOR SITE GRADING AND EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION OF A FOUR (4) STORY MULTI-FAMILY BUILDING (SEE CP-2025-004670) AS PER APPROVED PLANS. WORK TO INCLUDE TEMPORARY EXCAVATION SUPPORT SYSTEM. NO BUILDING CONSTRUCTION APPROVED ON THIS PERMIT. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR BUILDING CONSTRUCTION* · 1 permit