The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Fire protection & life safety
Fire suppression permit: TILLEY FIRE EQUIPMENT COMPANY, under CP-2025-006529 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 9 sprinkler heads to meet coverage of alterations · 2 permits
Feb 4, 2026 to May 22, 2026
Electrical
Electrical permit: JAMAAL STERLING, under CP-2026-004026 · Install wiring and fire alarm devices in a health care facility. All work to be perform according to the 2020 NEC, 2019 NFPA 72 and per approved plans. · 2 permits
Plumbing permit: DAVID WILLIAMS, under CP-2026-004026 · install one Hand Sink. All piping must be metallic installed to the 2021 PPC sec 919 · 1 permit