Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, sitework with onsite utility services: FOR SITEWORK AND ONSITE UTILITY SERVICES PER APPROVED PLANS. · 1 permit
Nov 14, 2025
Site work
Site work, sitework with onsite utility services: FOR SITEWORK AND ONSITE UTILITY SERVICES PER APPROVED PLANS. · 1 permit
Nov 14, 2025
Site work
Site work, excavation: EXCAVATION WORK ASSOCIATED WITH TANK INSTALLATION AND CONTAINMENT STRUCTURE AS PER APPROVED PLANS. *2018 IBC REVIEW* · 1 permit
Jun 30, 2026
Fire protection & life safety
Fire suppression permit: Charles G. Hunter III, under CP-2024-006724 · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 4" FIRE SERVICE LINE AND 4." RPZ WILKINS 350 AST BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. **ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.** · 2 permits
Nov 21, 2025 to May 13, 2026
Plumbing
Plumbing permit: KASER MECHANICAL LLC, under CP-2024-006724 · NEW CONSTRUCTION OF STORAGE BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC. STORMWATER DRAINNAGE PIPING SHALL BE CONNECTED TO APPROVED LOCATIONS ASA SPECIFIED IN PLANS AND UNDER SITE WORK PERMIT. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. · 2 permits
Dec 1, 2025 to Dec 5, 2025
Electrical
Electrical permit: Carr and Duff LLC, under CP-2025-005901 · Wiring of instrumentation and control panels, Furnishing and installing heat trace for wrap installation. All work to be perform according to the 2017 NEC and per approved plans. · 2 permits