Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, general earth disturbance only: SITEWORK ASSOCIATED WATER UTILITY LAGOON REHABILITATION AS PER APPROVED PLANS. *2018 IBC REVIEW* · 1 permit
Jun 30, 2026
Electrical
Electrical permit: DANYELLE PURDIE, under CP-2025-001729 · Electrical demolition and disposal as required for new work. Furnish and install new complete electrical wiring and systems as required for the new elevator system to function as per 2017 NEC. Provide all core drilling as required for your work. Install fire alarm as per 2016 NFPA 72. · 2 permits
Nov 5, 2025 to Oct 26, 2026
HVAC
Mechanical permit: CHADWICK SERVICE COMPANY, under CP-2025-001729 · FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO REGISTERS, DIFFUSERS ON THIS PERMIT. · 2 permits
Nov 5, 2025 to Dec 2, 2025
Plumbing
Plumbing permit: CHADWICK SERVICE COMPANY, under CP-2025-001729 · Install 1 trench drain · 1 permit
Dec 2, 2025
Electrical
Electrical permit: PHILIPS BROTHERS ELECTRICAL, under CP-2025-001729 · Replacement of the 5kv EIM Switchgear and Pump Starters as per 2017 NEC. · 1 permit