The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Plumbing
Plumbing permit: JBEG Development And Contracting LLC, under CP-2026-005456 · New piping to include: 2 Other (Install 1-4" valve and cap and 1-2-1/2" valve and cap on existing domestic water line for future tenant fit out in existing industrial facility). All work per 2021 PPC. · 2 permits
Sep 21, 2026 to Oct 3, 2026
Electrical
Electrical permit: Henry Barusevicius, under CP-2026-005456 · relocate 1200 a panel to column line j, feed from existing 200amp panel relocate 400a 480/277v panel, relocate 45kva transformer 480/208/120 relocate 100a 3 phase 208/120 panel install new feeder line 3-4 emt 3-sets 750mcm al wire ground as per 2020 NEC. · 2 permits
Sep 21, 2026 to Oct 20, 2026
HVAC
Mechanical permit: JBEG Development And Contracting LLC, under CP-2026-005456 · FOR INSTALLATION OF FUEL GAS PIPING AT ROOFTOP FOR FUTURE HVAC MECHANICAL EQUIPMENT. · 1 permit