The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
HVAC
Mechanical permit: JOHN J BEE INC, under CP-2025-001437 · Mechanical / Fuel Gas Permit for combo CP-2025-001437 · 2 permits
Dec 23, 2025 to Dec 24, 2025
Fire protection & life safety
Fire suppression permit: MK FIRE PROTECTION & SUPPLY, LLC, under CP-2025-001437 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. MK Fire Protection to relocate 11 sprinkler heads throughout permitted space · 2 permits
Dec 23, 2025 to Jun 18, 2026
Electrical
Electrical permit: HYDE ELECTRIC CORP, under CP-2025-001437 · Electrical Permit for combo CP-2025-001437 · 2 permits
Dec 23, 2025 to Jun 11, 2026
Plumbing
Plumbing permit: JOHN J BEE INC, under CP-2025-001437 · Plumbing Permit (Interior) for combo CP-2025-001437 · 1 permit