The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, excavation: Site / Utility Permit for CP-2025-005095 · 1 permit
Dec 11, 2025
HVAC
Mechanical permit: Oris-Hvac Inc, under CP-2025-005095 · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. · 2 permits
Dec 1, 2025 to Apr 30, 2026
Plumbing
Plumbing permit: THOMAS UHL, under CP-2025-005095 · Installing 1" water service, 5" curb trap, 4" Min drain, 4" fresh air inlet Installing 29 Fixtures 3 HWH'7 Lavs 7 Toilets 3 KS 3 Washers 6 Shower/tubs · 2 permits
Dec 1, 2025 to Apr 22, 2026
Fire protection & life safety
Fire suppression permit: Michael J Mccullough jr, under CP-2025-005095 · FOR THE INSTALLATION OF A 2-INCH FIRE SERVICE LINE FOR AN AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM WITH A BACKFLOW PREVENTION ASSEMBLY IN ACCORDANCE WITH NFPA 13R. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. · 2 permits
Dec 1, 2025 to May 30, 2026
Other trade
Multifamily new construction: NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH CELLAR, PRIVATE ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR USE AS A THREE (3) FAMILY DWELLING AS PER APPROVED PLANS. WORK TO INCLUDE UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** AMENDMENT APPROVED 7/15/26 AMEND NEW CONSTRUCTION PERMIT CP-2025-005095 FOR CHANGES TO FACADE MATERIALS AN · 1 permit
Dec 1, 2025
Other trade
Multifamily new construction: NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH CELLAR, PRIVATE ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR USE AS A THREE (3) FAMILY DWELLING AS PER APPROVED PLANS. WORK TO INCLUDE UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** AMENDMENT APPROVED 7/15/26 AMEND NEW CONSTRUCTION PERMIT CP-2025-005095 FOR CHANGES TO FACADE MATERIALS AN · 1 permit
Dec 1, 2025
Other trade
Multifamily new construction: NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH CELLAR, PRIVATE ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR USE AS A THREE (3) FAMILY DWELLING AS PER APPROVED PLANS. WORK TO INCLUDE UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** AMENDMENT APPROVED 7/15/26 AMEND NEW CONSTRUCTION PERMIT CP-2025-005095 FOR CHANGES TO FACADE MATERIALS AN · 1 permit