Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: J.W. Carrigan, under CP-2026-000062 · Install wiring, lighting, lighting controls, receptacle outlets and fire alarm system. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans. · 2 permits
Jan 21, 2026 to Mar 12, 2026
HVAC
Mechanical permit: HUNTER MECHANICAL INC, under CP-2026-000062 · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · 2 permits
Jan 21, 2026 to Feb 4, 2026
Fire protection & life safety
Fire suppression permit: INDEPENDENCE FIRE SPRINKLER COMPANY, under CP-2026-000062 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (4) sprinkler heads · 2 permits