Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
HVAC
Mechanical permit: DENNIS MCCAUSLAND, under CP-2025-005708 · FOR THE INSTALLATION OF ONE (1) 12'-0" TYPE I HOOD WITH EXHAUST FAN AND A MAKE UP AIR FAN WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. AMENDMENT APPROVED AS OF 8/12/26: TO RELOCATE THE PROPOSED HOOD AND ASSOCIATED DUCTWORK. SIZE AND LOCATION AS SHOWN IN THE AMENDED PLANS. · 2 permits
Nov 24, 2025 to Jan 28, 2026
Fire protection & life safety
Fire suppression permit: Cellich Fire Protection, under CP-2025-005708 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 7 heads for new ceiling installation · 2 permits
Nov 24, 2025 to Apr 1, 2026
Electrical
Electrical permit: Camelot Contracting LLC, under CP-2025-005708 · Installl 200 amp panel from the existing building service Install light, switches, and receptacles. ***NO FIRE ALARM ON THIS PERMIT*** · 2 permits
Nov 24, 2025 to Apr 16, 2026
Fire protection & life safety
Fire suppression permit: Atlantic Fire Equipment Co Inc, under CP-2025-005708 · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install kitchen fire suppression system · 2 permits
Nov 24, 2025 to Sep 29, 2026
Plumbing
Plumbing permit: DENNIS MCCAUSLAND, under CP-2025-005708 · AMENDMENT REVISION OF PLUMBING FLOOR PLAN AND RELOCATION OF FIXTURES ALTERATIONS TO RESTAURANT. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS · 1 permit
Jun 2, 2026
HVAC
Mechanical permit: WCD CONSTRUCTION, under CP-2025-005708 · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · 1 permit