The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
HVAC
Mechanical permit: DAVID WILLIAMS, under CP-2025-005350 · FOR THE INSTALLATION OF APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · 2 permits
Feb 6, 2026 to May 11, 2026
Electrical
Electrical permit: DERRICK TOWNES, under CP-2025-005350 · Wiring for 5 new residential units within an existing space all work per approved plans NEC 2017 ***NO FIRE ALARM ON THIS PERMIT*** · 2 permits
Feb 6, 2026 to Aug 17, 2026
Fire protection & life safety
Fire suppression permit: Precision Sprinkler Services, Inc, under CP-2025-005350 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 40 existing sprinkler heads for renovations · 2 permits
Feb 6, 2026 to Oct 22, 2026
Plumbing
Plumbing permit: DAVID WILLIAMS, under CP-2025-005350 · ALTERATIONS TO EXISTING MUTILI-FAMILY BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS · 1 permit