Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, excavation: Site / Utility Permit for CP-2025-003696 FOR EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION OF A FOUR (4) STORY THREE (3) FAMILY DWELLING AS PER APPROVED PLANS. WORK TO INCLUDE TEMPORARY EXCAVATION SUPPORT SYSTEM AND UNDERPINNING. NO BUILDING CONSTRUCTION APPROVED ON THIS PERMIT. **2018 IBC REVIEW** **SEPARATE PERMITS REQUIRED FOR BUILDING CONSTRUCTION** · 1 permit
Mar 10, 2026
Fire protection & life safety
Fire suppression permit: Aqueduct Fire Protection Systems, LLC, under CP-2025-003696 · FOR THE INSTALLATION OF FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH 2" WILKINS 950XL3 BACKFLOW PREVENTION ASSEMBLY AND FIRE SYSTEM TO INCLUDE THE INSTALLATION OF TWO (2) STANDPIPES IN EXIT STAIRWAYS, STANDPIPES TO BE INTERCONNECTED PER NFPA 14. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. ALL WORK SHALL BE · 2 permits
Feb 19, 2026 to Jul 22, 2026
Plumbing
Plumbing permit: Bradley Otto, under CP-2025-003696 · Plumbing Permit (Water Distribution) for combo CP-2025-003696 Plumbing per plans · 3 permits