The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, excavation: Site / Utility Permit for CP-2026-000757 · 1 permit
May 7, 2026
Other trade
Multifamily new construction: FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR, 2ND FLOOR REAR DECK AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS MULTI-FAMILY (3 UNIT) HOUSEHOLD LIVING. AS PER APPROVED PLANS. ********************************SEPARATE PERMITS FOR ANY OTHER WORK. ****************************** · 1 permit
Apr 25, 2026
Other trade
Multifamily new construction: FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR, 2ND FLOOR REAR DECK AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS MULTI-FAMILY (3 UNIT) HOUSEHOLD LIVING. AS PER APPROVED PLANS. ********************************SEPARATE PERMITS FOR ANY OTHER WORK. ****************************** · 1 permit
Apr 25, 2026
Other trade
Multifamily new construction: FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR, 2ND FLOOR REAR DECK AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS MULTI-FAMILY (3 UNIT) HOUSEHOLD LIVING. AS PER APPROVED PLANS. ********************************SEPARATE PERMITS FOR ANY OTHER WORK. ****************************** · 1 permit
Apr 25, 2026
Other trade
Multifamily new construction: FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR, 2ND FLOOR REAR DECK AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS MULTI-FAMILY (3 UNIT) HOUSEHOLD LIVING. AS PER APPROVED PLANS. ********************************SEPARATE PERMITS FOR ANY OTHER WORK. ****************************** · 1 permit