The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Other trade
Multifamily new construction: FOR UNDERPINNING AND FOR THE CONSTRUCTION OF AN ATTACHED BUILDING WITH WALK OUT ROOF DECKS AT SECOND FLOOR LEVEL AND BALCONIES AT THIRD FLOOR LEVEL. FOR USE A NON-ACCESSORY STRUCTURED PARKING [THREE (3) GARAGE PARKING SPACES] AND MULTI-FAMILY HOUSEHOLD LIVING [FIVE (5) DWELLING UNITS]. AS PER APPROVED PLANS. ********************SEPARATE PERMITS FOR ALL OTHER WORK. *************************************** · 1 permit