The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Other trade
Multifamily new construction: NEW CONSTRUCTION (RE-CONSTRUCTION, MORE THAN 2/3RDS JOIST REPLACEMENT AND REAR ADDITION) OF A THREE-STORY BUILDING WITH CELLAR AND CRAWL SPACE FOR USE AS THREE (3) FAMILY DWELLING AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** · 1 permit
Nov 21, 2025
Other trade
Multifamily new construction: NEW CONSTRUCTION (RE-CONSTRUCTION, MORE THAN 2/3RDS JOIST REPLACEMENT AND REAR ADDITION) OF A THREE-STORY BUILDING WITH CELLAR AND CRAWL SPACE FOR USE AS THREE (3) FAMILY DWELLING AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** · 1 permit